Planning

Planning and design work up to 132 kV associated with asset replacement and new build.

  • Specialist projects. e.g., DART Project costing, optioneering, cost analysis
  • Licence condition 25
  • Optimum Customer Security network analysis, GROND
  • Line surveys and condition assessments
  • System studies, fault level, load flow and voltage profile studies, embedded generation
  • Protection and metering - Technical and regulatory

HV/ LV system design work for NTR diversions and additional loads.